A guide based on official sources

Casa Verde Programme in Moldova

How the grant for energy renovation of an individual house works, who may participate, and how to prepare a sound project combining a heat pump, solar panels and battery storage.

Call III · planned for autumn 2026 Updated 21 September 2026
Casa Verde, FEERM and the National Centre for Sustainable Energy

Plan your project with Megawatt

Offer request
up to 50%of eligible investment
maximum MDL 200,000grant per project
2025–2027product period, through calls

Get ready for the next application call

The CNED director announced plans for a third call in autumn 2026. The sources checked on 21 September 2026 do not confirm an exact opening date.

  1. Call II

    Closed

    Approved projects are progressing towards implementation.

  2. Call III

    Planned for autumn

    Wait for CNED to publish the opening date and final conditions.

  3. What you can do now

    Prepare your file

    Documents, MPass access, consumption records and budget.

Before the call opens

Four things you can prepare now

Preparing does not submit an application or reserve a grant. Check the updated requirements as soon as CNED launches the next call.

  • Digital access

    Activate an electronic signature accepted by MPass. Verify and confirm the email in your profile to receive FEERM notifications.

  • Property documents

    Prepare your identity document, proof of ownership and co-owner details. For a house under construction, check the permit and design documents.

  • Photos and consumption

    Collect 5–10 relevant photographs, the previous year’s consumption records and recent utility bills, no more than three months old.

  • System and budget

    Request an indicative offer and plan funding for the full works. Commission the official technical assessment only after Component I approval.

Do not start works you intend to claim under the programme before signing the CNED financing agreement.

From application to grant

Your funding journey in 8 steps

Two approvals, an agreement and verification of the works come before grant payment. This diagram explains the currently published rules; the next call’s conditions and your signed agreement take precedence.

Steps 01–02

Apply

  1. Applicant

    Submit online

    Once the call opens, sign in to FEERM through MPass, select Casa Verde and submit the form with the required documents.

    OutcomeRegistered application, not an approved grant.
  2. CNED

    Component I approval

    CNED checks eligibility. Monitor FEERM and your email, and provide any requested additions within the notified deadline.

    OutcomeAdmission to the technical assessment stage.
Steps 03–04

Prepare the project

  1. Beneficiary + FEERM specialist

    Assess the house

    After approval, appoint an eligible specialist. The assessment, energy audit or feasibility study justifies the measures and costs.

    OutcomeTechnical documentation and budget.
  2. Beneficiary → CNED

    Component II application

    Submit the report, feasible measures and contribution commitment. CNED reviews the file and the committee decides on funding.

    Submit within 60 calendar days of Component I approval.
    OutcomeDecision on the works and funding.
Steps 05–06

Carry out the works

  1. Beneficiary + CNED

    Sign the agreement

    The agreement sets the maximum grant, obligations and implementation conditions. Only then contract the eligible works.

    Within 30 working days of receiving Component II approval notification.
    OutcomeSigned financing agreement.
  2. Beneficiary + FEERM contractor

    Implement and pay

    Choose a company from the FEERM list and implement the approved solution. Pay the full cost and retain supporting documents.

    180 calendar days from signing the agreement, under current rules.
    OutcomeCompleted works and documented costs.
Steps 07–08

Receive reimbursement

  1. Beneficiary + CNED

    Verification and acceptance

    Notify completion through FEERM and submit the works-related claim. CNED checks quantities, costs, payments and acceptance.

    Submit the works-related claim within 30 days of completion.
    OutcomeVerified investment and accepted documents.
  2. CNED → beneficiary’s account

    Grant payment

    After final approval and an addendum stating the exact amount, support is transferred in a single instalment to the beneficiary’s account.

    OutcomeReimbursement of approved eligible costs.

These deadlines are not a promise of the total processing time. Additional documents and checks can extend the process; deadline extensions require approval. For houses under construction, payment follows commissioning.

Understand the cash flow

Pay for the works first. Receive the grant later.

This is not an installation advance. You need your own or borrowed funds to finance the entire investment before reimbursement.

Illustrative example · MDL 320,000 in approved eligible costs
  1. You pay before reimbursement

    MDL 320,000

    The full cost in this example.

  2. CNED reimburses later

    MDL 160,000

    At 50%, if all costs are accepted and the applicable caps allow it.

  3. Your remaining cost

    MDL 160,000

    In this example, after the grant is received.

A 50% grant is not automatic, and support cannot exceed MDL 200,000 per project. Measure-specific caps also apply; ineligible costs remain entirely your responsibility.

Obligations continue after payment: retain the documents and allow CNED to monitor the project, as required by your agreement.

What is the Casa Verde programme?

Casa Verde is a financing product of Moldova’s Residential Energy Efficiency Fund (FEERM), managed by the National Centre for Sustainable Energy (CNED). It aims to reduce the energy consumption of individual houses through improvements to the building envelope, modernised systems and renewable energy.

In practical terms, the programme does not simply pay for a device selected by the homeowner. The project is assessed technically and its measures must form a justified solution for the building. Support takes the form of a grant of up to 50% of eligible investment, capped at MDL 200,000 per project and subject to the ceilings applicable to each type of work.

The product is valid from 1 July 2025 to 31 December 2027, but applications are accepted only during announced calls and until their allocation is exhausted. The published financing principle is first come, first served.

Who and which homes may be eligible?

The applicant must represent a household and own an individual house in the Republic of Moldova. The product covers:

  • individual houses registered in the Real Estate Register;
  • houses recorded by the local public authority where mass primary registration has not taken place;
  • individual houses under construction, with the urban planning documents, permit and design required by law;
  • duplex houses, which the product treats as individual houses.

The house must be in a technical condition that allows the works. The applicant declares that there are no arrears to the national public budget and no relevant disputes concerning the property. Ownership and the position of any co-owners must be documented.

For a house under construction, the support is not intended for a property prepared for sale or rent. The purpose is the beneficiary household’s home.

What works may be financed?

The official list covers both the building envelope and its technical systems. The assessment report, energy audit or feasibility study determines which measures are justified for the specific house.

AreaExamples of eligible measures
Roofthermal insulation of all roof types
Walls and plinththermal insulation of exterior walls and/or plinth
Basementinsulation of the basement or semi-basement slab from below
Windows and doorsreplacement or installation of efficient exterior joinery
Heating and hot waterheat distribution, biomass boiler, solar thermal collectors and heat pumps
Ventilationheat-recovery ventilation and controls
Photovoltaicssolar panels with batteries, a smart meter and the permitted related configurations
Protective worksworks strictly required to protect or enable the primary energy measure

Some measures depend on others. For example, wall insulation is admitted after replacement of exterior joinery or together with it. A heat pump and the photovoltaic group may be conditional on roof, wall and window measures being implemented, unless the technical report confirms that they are already complete or are not feasible.

Photovoltaic panels and batteries under Casa Verde

For a homeowner interested in solar energy, the crucial point is that the product does not describe financing for stand-alone panels. The published eligible configurations combine photovoltaic panels, battery storage and a smart meter with one of the following situations:

  1. an air-to-water, ground-to-water or water-to-water heat pump is installed at the same time;
  2. the applicant owns a fully electric vehicle and the project may also include a charging station;
  3. the applicant already owns an eligible heat pump;

An existing system may be expanded if technically justified and compliant with the product’s configurations and conditions. This is not a separate eligibility category; the grant cap applies only to the additional capacity.

Panel power, battery capacity and the heat pump’s consumption must be coordinated. Oversizing a system simply to reach the grant ceiling may fail the technical and economic justification. Megawatt can model consumption, generation and storage scenarios before the final configuration is selected.

Documents worth preparing

The exact list must be checked for each call. Published requirements principally include:

  • details of the applicant, co-owners and family members;
  • identity document and evidence of rights to the property;
  • an extract from the Real Estate Register or local-authority confirmation, where applicable;
  • information about the house, areas, envelope and technical systems;
  • 5–10 clear photographs of the elements or systems to be renovated;
  • energy resources consumed in the previous year and utility suppliers;
  • recent utility invoices, generally no more than three months old;
  • declarations on technical condition, public-budget obligations, disputes and data processing;
  • a neighbour’s consent where the house falls within the boundary-distance situation specified by the product;
  • for a house under construction, the urban planning certificate or notice, valid permit and design documentation.

Additional documents are required later: the technical report, budget estimate, proof of own contribution, contracts with contractors, invoices, payment orders, equipment certificates and final acceptance records.

Important points for a well-prepared project

  • The grant is reimbursed. The beneficiary must be able to finance the full works temporarily using own funds or a loan.
  • Feasibility is mandatory. Not every desired measure is automatically approved; the report must confirm savings and technical-economic indicators.
  • Works must be traceable. Unverifiable cash payments, discrepancies between the approved offer and execution, or equipment changed without approval may prevent reimbursement.
  • The contractor is not chosen from any source. The product requires legal entities accepted on the FEERM platform.
  • Changes must be coordinated. Any material change to the approved solution should be discussed and accepted before execution.
  • Integrated sizing is safer. For a heat pump, photovoltaic system and battery, design should start with heat loss, annual consumption and the hourly load profile, not merely roof area.

How Megawatt can help

Megawatt supplies residential photovoltaic systems, energy storage and heat-pump integration. At the preparation stage, we can:

  • analyse bills and the expected load profile;
  • verify usable roof area and installation constraints;
  • size the photovoltaic system and battery for actual consumption;
  • include the demand of a heat pump and charging station;
  • prepare a clear technical and commercial offer separating equipment and works;
  • explain which technical information must be validated by the FEERM assessor.

Megawatt cannot promise grant approval, but a coherent, documented project reduces uncertainty and supports a sound investment decision even if a future call updates some conditions.

Clear answers

Frequently asked questions about Casa Verde

All questions are collapsed by default. Open the item you need.

Is Casa Verde currently open for new applications?

Call II is closed. On 15 July 2026, the CNED director announced plans for a third call in autumn 2026. Sources checked on 21 September do not confirm the exact launch date. New applications can be submitted only after the official opening, under the conditions published then; preparing documents does not reserve a grant.

Is the grant exactly 50% for every project?

Not automatically. The grant may cover up to 50% of eligible expenditure, subject to the ceilings for each measure and an overall maximum of MDL 200,000 per project. Ineligible costs, amounts above a ceiling and additional works remain the beneficiary’s responsibility.

Must I pay for the works before reimbursement?

Yes. According to CNED’s official explanation, the beneficiary pays the full cost from own or borrowed funds. CNED then reimburses the eligible share after checking contracts, invoices, proof of payment and final acceptance documents.

Can I apply if my house is still under construction?

Yes, provided it is an individual house and the required documents exist: an urban planning certificate or applicable notice, a valid building permit or legally equivalent documents, and project documentation. The applicant must also declare that the property is not intended for sale or rent.

Can I receive the grant only for photovoltaic panels?

Not in every configuration. The photovoltaic group requires panels with battery storage and is linked to an eligible heat pump or, in a separate case, ownership of a fully electric vehicle. The technical report must confirm feasibility, while requirements concerning the building envelope may also affect approval.

Are photovoltaic panels without a battery eligible?

The photovoltaic configurations listed in the financing product include battery storage and a smart meter for differentiated metering. A panel-only system does not match the published configurations.

Can an existing photovoltaic system be expanded?

Yes, if the expansion is technically justified. The maximum grant is calculated only against the additional installed capacity, not the capacity already in place.

May I start works before the financing is approved?

No. Works carried out before the financing agreement is signed are not eligible for reimbursement. The safe order is application, eligibility review, technical report, Component II approval, CNED agreement, and only then contracting and execution.

Who performs the energy assessment and the works?

The assessment, energy audit or feasibility study is prepared by an eligible specialist from the FEERM platform list. Works are contracted to legal entities selected and listed on the FEERM platform under the product rules.

How long do I have to complete the works?

After signing the financing agreement, the published deadline is 180 calendar days for any required design documentation and the works. For a house under construction, the Financing and Risk Committee may approve an extension, but not beyond 360 days.

What happens if the application is incomplete?

CNED may request additions or clarifications through the FEERM platform. If the applicant does not respond within the communicated deadline, the file may be declared non-compliant or returned. Monitor both the FEERM account and the email linked to MPass.

Can Megawatt guarantee approval of the grant?

No. Approval belongs exclusively to CNED and its Financing and Risk Committee. Megawatt can analyse consumption, configure the photovoltaic system, battery and heat pump, prepare a clear technical and commercial offer, and explain the technical documentation required.

Does requesting a Megawatt offer also apply for the grant?

No. A Megawatt offer helps you prepare the system and budget. A grant application is separate and must be submitted exclusively through FEERM during an open call. Megawatt does not reserve places or decide funding.

What evidence is needed for grant payment?

Prepare records of completed works, applicable certificates and technical reports, photos, invoices and proof of full payment. The manual requires the works-related claim within 30 days of completion and payment documents within 10 days at the stage when CNED requests them. Payment follows verification, acceptance, final approval and the signed addendum; no payment date measured from the initial application is guaranteed.

Prepare the project early

Would you like an energy solution suitable for Casa Verde?

Megawatt can size the photovoltaic system, battery and heat pump as one coherent solution and prepare a clear technical and commercial offer for the next call.

Megawatt does not administer Casa Verde and does not award the grant. This information is explanatory; final eligibility and the approved amount are determined by CNED under the applicable documents and call.