Electrical infrastructure 
# High-voltage electrical works

We integrate transformation, switching, protection and metering within applicable authorisations and the contractual scope.

 [Request a consultation ](https://megawatt.md/en/request) [View projects](https://megawatt.md/en/projects) 

- Grid-connection solutions
- Protection and automation
- Testing and commissioning

 ![High-voltage electrical infrastructure](https://megawatt.md/user/images/services/service-type-high-voltage-1.webp) Safety and documented testing 

Technical coordination
## Connection infrastructure is part of the project

Projects may require transformers, switchgear, lines, cables, protection and metering. The solution follows connection conditions and existing installations.

We document interfaces and testing. Voltage level, scope and responsibilities are specified for each project.

Work areas
## From the diagram to energisation

Work follows the design and applicable standards.

### Electrical concept

Power and connection scheme coordination.

### Engineering

Diagrams, plans and calculations.

### Transformation

Transformers and switchgear.

### Protection

Protection and automation settings.

### Lines and cables

Routes and connections.

### Testing

Verification and documented results.

Controlled delivery
## Verified equipment and connections

Operation and maintenance are considered during design.

![Electrical substation](https://megawatt.md/user/images/services/service-type-high-voltage-1.webp)Infrastructure matched to the project

![Electrical protection equipment](https://megawatt.md/user/images/services/service-type-high-voltage-2.webp)Integrated protection

Stages
## Preparation before energisation

Interfaces and responsibilities are defined.

1. 01
    ### Connection data

    Conditions and power review.
2. 02
    ### Engineering

    Solution and testing definition.
3. 03
    ### Delivery

    Installation of contracted infrastructure.
4. 04
    ### Testing

    Verification and commissioning coordination.

Frequently asked questions
## Technical clarifications

Which voltage levels are covered?

The level and scope are assessed according to connection, authorisations and contract.

Can a transformer station be included?

Yes, when it forms part of the project solution and quotation.

Who coordinates commissioning?

Responsibilities are defined before work begins and follow the applicable documentation.

Electrical project
## Discuss grid requirements with our technical team

Send available data on power, voltage, site and connection.

 [Request a technical consultation ](https://megawatt.md/en/request)

---