---
title: 'Solar system financing'
url: 'https://megawatt.md/en/financing'
markdown: 'https://megawatt.md/en/financing.md'
lang: en
date: '2026-09-21'
description: 'Verified guide to solar system financing in the Republic of Moldova: Casa Verde, GEFF, AIPA, CREȘTEM IMM, FACEM and Programme 373.'
---

Verified financing for the Republic of Moldova 
# Solar system financing

Instruments for individuals, companies, agricultural producers and homeowners' associations, explained clearly and linked to the official terms.

 Information verified on 21 September 2026

 **7 options** reviewed separately 

 **3 categories** grant, loan and mixed instrument 

 **Official sources** for every programme 

The right financing option depends on the applicant's legal status, the use of the electricity, the size of the investment and the programme calendar. A grant, a preferential loan and an interest subsidy are different mechanisms and should not be confused.

The partner logos shown in the homepage section illustrate Moldova's support ecosystem. They do not, on their own, confirm that a call is open or that a project is automatically eligible.

 ![Grant for the energy renovation of individual homes](https://megawatt.md/user/pages/07.financing/financing-casa-verde.webp)  ![CNED / FEERM — Casa Verde](https://megawatt.md/user/pages/07.financing/logo-casa-verde.png)  

 CNED / FEERM — Casa Verde 
## Grant for the energy renovation of individual homes

 Call II closed 

Casa Verde provides households with a grant for the energy renovation of individual homes. By 18 September 2026, the Component I evaluation for Call II had ended: 757 applications were approved and 231 files had reached Component II approval.

 Non-repayable supportup to 50%

Household ceilingup to MDL 200,000

Current status1,292 Component I approvals

### May be relevant to

- owners of individual houses and homes under construction, subject to the call guide
- thermal insulation, efficient windows, heat pumps and installation upgrades
- photovoltaic panels together with battery storage, in an eligible configuration

Call II closed on 21 March 2026 after reaching approximately 1,000 applications. No new application can be submitted unless CNED opens a later call. Read the dedicated guide before contracting works.

 [ Complete Casa Verde guide ](https://megawatt.md/en/financing/casa-verde) [ Official Casa Verde status ](https://cned.gov.md/ro/content/casa-verde-1292-de-proiecte-aprobate-componenta-i-231-de-dosare-aprobate-componenta-ii) 

 ![Green loan with a grant after investment verification](https://megawatt.md/user/pages/07.financing/financing-geff.webp)  ![Residential GEFF Moldova](https://megawatt.md/user/pages/07.financing/logo-geff.png)  

 Residential GEFF Moldova 
## Green loan with a grant after investment verification

 Available 

The EBRD facility supports residential energy-efficiency and renewable-energy investments, including eligible photovoltaic systems. Participating institutions provide the finance, while the grant component is paid only after implementation and verification.

 Individualsgrant of up to 22.5%

Building-level projectsgrant of up to 35%

Developersgrant of up to 15%

### May be relevant to

- house or apartment owners installing eligible technologies
- homeowners' associations and service providers for apartment buildings
- green housing developers and eligible vendors

The exact percentage depends on the applicant category and the technologies included. Check eligibility in the Green Technology Selector before ordering. Energy storage may also be required for certain building-level photovoltaic projects.

 [ Official GEFF terms ](https://ebrdgeff.com/moldova/grant-support-2/) 

 ![Support for agricultural producers' investments](https://megawatt.md/user/pages/07.financing/financing-aipa.webp)  ![AIPA / AESP 2026–2030](https://megawatt.md/user/pages/07.financing/logo-aipa.png)  

 AIPA / AESP 2026–2030 
## Support for agricultural producers' investments

 Subject to call 

The new agricultural policy framework includes interventions for farm modernisation, climate resilience and renewable energy. A photovoltaic system may qualify when it forms part of the agricultural investment covered by the intervention and applicant guide currently in force.

 Applicantseligible agricultural producers

MechanismAIPA intervention and call

ApplicationAIPA / e-AIPA

### May be relevant to

- on-site consumption at farms and processing units
- irrigation, refrigeration, storage and farm infrastructure
- integrated investments reducing energy cost and exposure

There is no single permanent percentage for all photovoltaic projects. The ceiling, own contribution, deadline and eligible expenditure are set by each call's guide. Confirm the current call before signing contracts or making payments.

 [ Official AIPA 2026–2030 framework ](https://aipa.gov.md/despre-aipa/intrebari-frecvente/) 

 ![Grant for green transition and energy efficiency](https://megawatt.md/user/pages/07.financing/financing-crestem-imm.webp)  ![ODA — CREȘTEM IMM](https://megawatt.md/user/pages/07.financing/logo-oda.svg)  

 ODA — CREȘTEM IMM 
## Grant for green transition and energy efficiency

 Call temporarily closed 

This instrument supports business modernisation and environmentally beneficial investment. On the verification date, ODA lists the call as temporarily closed; the figures below are useful for preparing for a possible new intake.

 Micro-enterprisesup to MDL 1.5 million

Small enterprisesup to MDL 2 million

Medium enterprisesup to MDL 3 million

### Published co-financing rates

- green transition: up to 50% for micro, 45% for small and 35% for medium enterprises
- technological modernisation and energy efficiency: up to 35%, 30% and 25%, respectively
- a 10 percentage-point increase for women- or youth-owned businesses, within the programme rules

Do not treat the call as open until ODA publishes a new application period. De minimis rules and the cumulative ceiling stipulated by the instrument apply.

 [ ODA status and terms ](https://www.oda.md/en/grants/apel-deschis-en/crestem-imm-main-en) 

 ![Investment loan for the energy transition](https://megawatt.md/user/pages/07.financing/financing-facem-bgk.webp)  ![ODA — FACEM Sustainable Investments BGK](https://megawatt.md/user/pages/07.financing/logo-oda.svg)  

 ODA — FACEM Sustainable Investments BGK 
## Investment loan for the energy transition

 Financing available 

A product for small and medium-sized enterprises making sustainable investments. Its published list covers renewable-energy and energy-efficiency technologies, including photovoltaic-system components.

 Amountup to EUR 375,000

Published interest5.5% MDL / 4.5% EUR

Assistancevoucher of up to EUR 1,000

### May be relevant to

- photovoltaic systems intended to reduce on-site electricity consumption
- equipment modernisation and energy efficiency
- climate investments integrated into business operations

Credit approval and the availability of funds remain with the participating financial institution. Request written confirmation of eligible costs and assess foreign-exchange risk separately for EUR financing.

 [ Official FACEM BGK terms ](https://www.oda.md/ro/acces-la-finantare/facem-investitii-bgk) 

 ![Investment loan with state-compensated interest](https://megawatt.md/user/pages/07.financing/financing-program-373.webp)  ![Government Programme 373](https://megawatt.md/user/pages/07.financing/logo-program-373.png)  

 Government Programme 373 
## Investment loan with state-compensated interest

 Available through 2028 

The programme finances business investments, and photovoltaic and wind equipment are expressly listed as eligible uses. The state compensates the difference between the market interest rate and the portion paid by the beneficiary.

 Published ceilingup to MDL 40 million

Beneficiary interest7% MDL / 3% foreign currency

Programme termthrough 31 December 2028

### May be relevant to

- SMEs planning a substantial photovoltaic investment
- projects where the system forms part of a broader business upgrade
- companies able to provide the required own contribution and service the debt

This remains a loan, not a grant. The financial institution assesses creditworthiness, collateral and cash flow. Foreign-exchange risk must be assessed separately for loans denominated in foreign currency.

 [ Official Programme 373 portal ](https://373.gov.md/) 

 ![Long-term loan for investments with impact](https://megawatt.md/user/pages/07.financing/financing-facem-impact.webp)  ![ODA — FACEM Impact](https://megawatt.md/user/pages/07.financing/logo-facem-impact.png)  

 ODA — FACEM Impact 
## Long-term loan for investments with impact

 Financing available 

The instrument may support green projects and investments that reduce business operating costs. For photovoltaic projects, the relevant use is electricity generation for the company's own consumption.

 AmountMDL 200,000–5,000,000

Termup to 10 years

Fixed interest5.5% or 6%

### May be relevant to

- own-consumption and energy-efficiency investments
- businesses requiring a longer repayment period
- projects creating jobs that may qualify for an interest reduction

Projects producing electricity solely for sale to the grid or third parties are not eligible under this instrument. Subject to the programme rules, the rate may decrease according to the jobs created.

 [ Official FACEM Impact terms ](https://www.oda.md/en/facem-impact-en) 

 Recommended sequence 
## How to prepare the financing correctly

Financial eligibility should be confirmed before equipment is ordered or paid for.

1. 1### Consumption analysis

    Define the load profile, investment objective and technically justified system capacity.
2. 2### Technical offer

    Obtain the proposed solution, cost estimate, diagram and equipment specifications.
3. 3### Programme check

    Confirm the applicant, eligible expenditure, own contribution and application deadline.
4. 4### Finance file

    Prepare legal documents, financial statements, permits and requested quotations.
5. 5### Approval

    Wait for the administrator's or lender's decision before committing expenditure.
6. 6### Implementation and verification

    Retain all records, follow the technical conditions and allow final verification.

 The first useful document 
## Start with a realistic technical assessment

We will prepare the photovoltaic configuration and technical-commercial proposal required for discussions with the lender or programme administrator.

 [ Request a Solar Quote ](https://megawatt.md/en/request)

---

## Navigation

- Previous: [Solar Calculator](https://megawatt.md/en/calculator.md)
- Next: [Photovoltaic services in the Republic of Moldova](https://megawatt.md/en/services.md)
- Children:
  - [Casa Verde Programme in Moldova](https://megawatt.md/en/financing/casa-verde.md)
